Langley Park Wind Farm is a wind farm near Langley Park, County Durham, England. It was developed by EDF Energy and is operated by Cumbria Wind Farms, the farm has a nameplate capacity of 8MW, containing four Repower 2.0 turbines each rated at 2MW.

In 2008 EDF accepted that it had failed to check the impact of the turbines on digital television reception, after residents of villages where the turbines lay on a line-of-site to the local TV transmitter complained of a loss of signal strength and severe Freeview Digital Services disruption, particularly when the turbine blades rotate.

Langley Park Wind Farm
Country England, United Kingdom
Locale Langley Park, County Durham
Status Operational
Commission date December 2008
Owner(s) EDF Energy

Turbine information
Turbines 4 × 2 MW
Manufacturer(s) Repower
Model(s) 2.0
Wind farm information
Avg. site elevation 1552 ft

Power generation information
Maximum capacity 8 MW