The Melancthon EcoPower Centre is a 199.5 megawatt (MW) wind farm in Melancthon Township, near Shelburne, Ontario. The centre, Canada's largest wind energy installation, is owned and operated by Canadian Hydro.

Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.