The Fenton Wind Power Plant is a 205.5 megawatt wind energy project built by enXco, that became operational in the second half of 2007. The $385-million project is in Chandler, Minnesota on a site that encompasses Murray and Nobles counties and consists of 137 GE 1.5 MW wind turbines.

Power generated by the Fenton Wind Energy project will be sold to Northern States Power, a subsidiary of Minneapolis-based Xcel Energy.

The land was and is subject to archeological surveys as it is situated in culturally sensitive area previously inhabited by the Dakota.